1

Classic Case

 

Free Call

03517026793

 

Classic Case

Location: > Home > Classic Case

 
One group’s energy-saving projects of the water source heat pump room in Hebei
 

产品详细介绍

 

A technical energy-saving energy control system of ground source heat pump air conditioning room in Hebei,computer room come from the original boiler room's transformation. It is consists of five  water source and heat pumps,which provides for mining area were building and Lord\deputy ventilation.It provides 50/45 ℃ hot water  in Winter,and 7/12 ℃ cold water in summer,in order to the air conditioning system. The four heat pump HOST is 781 kw power from TRANE.Source water side is seted two sets of water pump, one with a ready ,whose power is 90Kw.  Load side is seted two sets of water pump, one with a ready ,whose power is 110Kw. The 60/55 ℃ hot water With ,prepared by hot bath health water host, is from   two sets of displacement heat exchanger heat to wash bath after water points. The hot water's supplying temperature is 40 ℃ . The  Hot water heat gensets adopt YORK machines, everyone inputing  power is 740 kw .

The same the source water side is seted two sets of water pump, one with a ready ,whose power is 90Kw.  Load side is seted two sets of water pump, one with a ready ,whose power is 110Kw.All source water side adapt mine waste water. Mine waste water is treated  by hydrocyclone sand-remover and efficient plate heat exchanger heat,which is provided for air conditioning system .

    The saving power in Year-round: 2538400KwHr Efficiency of saving electricity : 44%

 
 
 
Copyright @ 2015 Shanxi Lineng HVAC Science And Technology Co., Ltd   CALL:0351-7026793

Address: Taiyuan High-tech Zone Industry Road 36, Block   

Technical Support:
1